• New sidewalk at Indiana University

  • Project: New sidewalk

    Location: Indiana University South Bend

  • We established the layout and elevations based on the plans. We excavated for the new sidewalk and installed fill dirt and crushed concrete for the base. The concrete work was performed by a subcontractor contractor. Upon completion of the sidewalk we installed topsoil and sod along the edges of it.