The area was cleared of brush and vegetation. Fill dirt was delivered and compacted. [...]
This project involved moving a small tree and then stripping sod in the yard where a tree had been [...]
First, the existing railroad tie retaining walls were removed. Then a 20 inch thick concrete pad [...]
After clearing small trees and vegetation as well as removing silt and mud, screened topsoil was [...]
We screened the topsoil that was left on site with our mobile screener then placed the topsoil on [...]
Topsoil installation on the elevated part of the roundabout at Chippewa and Michigan st. We hoisted [...]